Wakanda Jobs is not the employer and does not process applications for this job. Never pay money for a job application, interview, or employment offer. If anyone requests payment, treat it as suspicious and report it to us.
Botswana plans to harness its renewable energy (RE) resources and accelerate renewable energy development through the implementation of the Integrated Resource Plan (IRP). The Government of Botswana is currently developing renewable energy projects at several pre-selected sites. The Project and Energy Development Unit (PEDU) under the Ministry of Minerals and Energy (the Client) is responsible for the development of these projects. A feasibility consultant has identified a proposed site for a wind farm based on a multi-criteria assessment considering preliminary wind resource data, transmission infrastructure, land use and ownership, and preliminary environmental and social considerations.
The geotechnical studies will support the development of a proposed 100 MW wind farm located north of Letlhakane, Botswana. The final coordinates and boundaries of the area to be investigated will be confirmed by the Client prior to commencement of the assignment.
Expressions of Interest clearly labelled "Expression of Interest - Consultancy Services for Geotechnical Studies for a Wind Farm in Botswana," must be hand-delivered or emailed at the address below by 11 November 2026 at 12:00 hours (CAT). Electronic submissions should be password protected.
Attention: The Permanent Secretary, Ministry of Minerals and Energy
Block D, Third Floor, Office No DT 10, Plot No. 50676
Fairgrounds Office Park, Gaborone
Republic of Botswana.
Telephone Nos: (+267) 3xxxxxx/6628
Mobile Nos: +267 7xxxxxxx
Electronic mail address: fxxxxxxx@gov.bw
REF Code: EOI/MME-PEDU/002/26-27